National Board Violation Findings

Reporting Year: 1999
Total Inspections: 22415
1. BOILER CONTROLS

1.1 Lo Water Cutoff and Flow Sensing Devices

25

1.2 Pressure Gages

4

1.3 Water Gage Glass

3

1.4 Pressure Controls

34

1.5 Temperature Controls

45

1.6 Undefined Controls Violations

22

 
2. BOILER PIPING AND OTHER SYSTEMS

2.1 Main Steam System

1

2.2 Bottom Blow and Drain System

1

2.3 Feedwater, Condensate/Return Systems

2

2.4 Expansion Tanks and Heating System Piping

.

2.5 Casing, Stack Breaching and Flue

.

2.6 Burners and Fuel Supply Systems

75

2.7 Undefined Boiler Piping and Other Systems

.

 
3. BOILER MANUFACTURER'S DATA  REPORT & NAMEPLATE

3.1 No Data Report

.

3.2 Nameplate Stamping Incorrect/Missing

.

3.3 Undefined Manufacturer's Data Report & Nameplate

.

 
4. BOILER COMPONENTS

4.1 Fireside Water Leaks

36

4.2 Baffles and/or Refractory

46

4.3 Furnace and Fireside

68

4.4 Waterside

12

4.5 Superheaters

.

4.6 Economizers

.

4.7 Installation

.

4.8 Undefined Boilers

.

 
5. PRESSURE RELIEVING DEVICES FOR BOILERS

5.1 Installation

7

5.2 Operation

56

5.3 Undefined Pressure Relieving Devices

.

 
6. PRESSURE VESSEL

6.1 Installation

8

6.2 Material Condition

36

6.3 Manufacturer's Data Report & Nameplate

.

6.4 Pressure Relieving Devices

57

6.5 Undefined Pressure Vessels

.

 
7. REPAIRS AND ALTERATIONS

7.1 Unqualified Organization

.

7.2 Unauthorized Repair

.

7.3 Code Deficiencies

6

7.4 Undefined Repairs and Alterations

.